Total Inspections ⊡
3
3 completed
Open NCRs ⚠
1
1 open, 0 under review
Open Punch Items ⊘
2
Class A & B
Completion Rate ✓
100%
inspections completed
Recent Inspections
| Inspection | Component Part | Date | Progress | Status |
|---|---|---|---|---|
| XYZ-INS-003 | BRACKET LEG | 2026-06-06 | 100% | COMPLETED |
| XYZ-INS-002 | MAIN FRAME WELD | 2026-06-05 | 100% | COMPLETED |
| XYZ-INS-001 | FOUNDATION GRID C | 2026-06-01 | 100% | COMPLETED |
Open NCRs
Abc123-NCR-001
Check steel plate storage location
MINOROPENDue: 2026-06-13
Upcoming Punch Items
PUNCH-001A Class
Touch up paint on bracket leg bottom surface
Due: 2026-06-20 · Coating
PUNCH-002B Class
Install missing identification labels on all components
Due: 2026-06-25 · Documentation
Safety Observations
🚨
Workers not wearing safety glasses in grinding areaHIGH
📍 Area B, Bay 3 · 2026-06-05 · OBS-001
⚠️
Missing barrier tape around excavation zoneMEDIUM
📍 Grid D Foundation · 2026-06-06 · OBS-002
Inspection Status
Draft — 0
In Progress — 0
Completed — 3
All Inspections 3 records
| Inspection ID | Component Part | Template | Date | Inspector | Progress | Status |
|---|---|---|---|---|---|---|
| XYZ-INS-003 | BRACKET LEG | Structural ITP | 2026-06-06 | J. Wang | 5/5 | COMPLETED |
| XYZ-INS-002 | MAIN FRAME WELD | Weld Visual ITP | 2026-06-05 | J. Wang | 6/6 | COMPLETED |
| XYZ-INS-001 | FOUNDATION GRID C | Civil ITP | 2026-06-01 | J. Wang | 4/4 | COMPLETED |
Basic Information
Select Template
Structural Steel ITP — Checklist
0 / 5
#
Inspection Item
Acceptance Criteria
Result
Remark
01
Dimensional Check (length / width / thickness)
Per drawing ±2mm
—
02
Weld Visual Inspection (no cracks / porosity)
AWS D1.1 Section 6
—
03
Surface Treatment (blasting grade)
Sa 2.5 min
—
04
Bolt Torque Check
Per spec TQ-003
—
05
Material Certification Review
Mill cert. on file
—
All
Open
Under Review
Closed
| NCR No. | Description | Inspection | Severity | Raised By | Due Date | Status |
|---|---|---|---|---|---|---|
| Abc123-NCR-001 | Check steel plate storage location | XYZ-INS-002 | MINOR | J. Wang | 2026-06-13 | OPEN |
OPEN
Abc123-NCR-001
Raised 2026-06-01 · Due 2026-06-13
Description
Steel plate stored without weatherproof covering in outdoor area — does not comply with ITP Section 4.2 storage requirements.
Non-Conformance Category
Storage & Handling
Action Required
Apply protective covering and submit photo evidence of corrective action. Re-inspection required prior to resuming fabrication.
Related Inspection
Details
Severity
MINORRaised By
J. Wang (FCE)
Assigned To
XYZ QC Team
Due Date
2026-06-13
Activity Log
NCR Raised
2026-06-01 · J. Wang
Notification Sent
2026-06-01 · System
Punch List 2 items
| Punch No. | Category | Description | Inspection | Class | Due Date | Status |
|---|---|---|---|---|---|---|
| PUNCH-001 | Coating | Touch up paint on bracket leg bottom surface | XYZ-INS-003 | A Class | 2026-06-20 | OUTSTANDING |
| PUNCH-002 | Documentation | Install missing identification labels on all components | XYZ-INS-003 | B Class | 2026-06-25 | OUTSTANDING |
Summary
2
Outstanding
0
In Review
0
Cleared
1
High
1
Medium
0
Low
Workers not wearing safety glasses in grinding area
HIGH
OPEN
3 workers operating angle grinders without eye protection. Immediate correction required — OHSAS 18001 Section 8.1.
Missing barrier tape around excavation zone
MEDIUM
OPEN
Excavation near Foundation Grid D lacks required 1.2m barrier tape and safety signage. Fall hazard identified.
Project Documents 4 files
File Name
Type
Uploaded
Size
Actions
📋
XYZ-ITP-STR-001.pdf
Structural Steel Inspection & Test Plan
ITP
2026-05-15
2.4 MB
📄
FCE-PROC-WEL-001.pdf
Welding Inspection Procedure
Procedure
2026-05-10
1.1 MB
📐
XYZ-DRW-BRACKET-A3.pdf
Bracket Leg Assembly Drawing (Rev.2)
Drawing
2026-06-01
5.8 MB
📜
Material-Certificate-Q235B.pdf
Mill Test Certificate — Q235B Steel Plate
Certificate
2026-06-03
892 KB
THE ProQ™ ADVANTAGE
Real-Time Quality Control.
No Information Gap.
No Information Gap.
While your inspector is still on site — your client already knows the result.
No waiting. No surprises. No back-and-forth emails at handover.
No waiting. No surprises. No back-and-forth emails at handover.
INSPECTOR · ON SITE
Marks checklist in real time
Attaches photos and remarks
Logs NCRs and safety observations
Attaches photos and remarks
Logs NCRs and safety observations
→
Live Sync
zero
delay
delay
MANAGER / CLIENT · OFFICE
Sees results as they happen
Reviews NCRs and reports live
Makes decisions with real data
Reviews NCRs and reports live
Makes decisions with real data
Zero Reporting Lag
Results go live the moment the inspector submits — no email delays, no version confusion
Catch Issues Early
React before a defect becomes a delay — when corrective action is still cheap and fast
One Source of Truth
Field, PM, and client see the same live data — no more conflicting versions at handover
Ready to close the gap? [email protected]